Description
Each Telco Tower consumes a minimum of 5kW of energy 24/7
- If on grid each consumes $8,760 to $15,330 of electricity per annum
- Or off grid 10,512 litres of diesel per annum (plus theft and oil changes etc) with a delivered price av ~$2 per litre is ~$21,000 per annum minus rebate?
CR VAWT Pty Ltd can add a 15kW CR VAWT (Contra Rotating Vertical Axis Wind Turbine) to totally negate the carbon footprint.
As a starting point the basic cost will be $43,700 per tower for all components required, plus a site allowance depending on required energy and location/accessibility.
Can the environment afford to NOT have these on every Telcom installation?
Reviews
There are no reviews yet.